Rattray foundation Head office
       Rattray foundation head office     O ur most challenging project yet where we had to build on a gradient and the base was all clay   Obviously rammed earth adds some additional challenges to this type of construction                                        Embedded in the clay was huge granite rocks that had to be burnt and cooled to break before we could get   Down to foundation level         All foundations in the basement are reinforced 1m x 0.8 with 16 mm rebar   Olso tied to these vertically where tie bars for the retaining wall  this had to be done as    three sides of the wall are holding back the clay           The vertical bars that will run up the retaining walls to create a stressed member         Shows the bars that will run all the way through the wall to the top of the slab               Then two lines of bricks 300 mm apart with our Steal  in the cavity we can lift three lines at a time and then   Fill with concrete                 The following ...